Port Infrastructure Development Program (PIDP)

The PIDP is set to enhance the Port's infrastructure and boost its operational efficiency. 

Key Enhancements:

  • Revamped Main Port Gate: The redesign of the main port gate off MLK Blvd. will introduce additional lanes, streamlining truck entry and improving cargo transport efficiency within the Port.
  • Advanced Truck Processing System: A new system will cut incoming container truck wait times by 50%, significantly reducing emissions and enhancing overall port operations.
  • Expanded Freight Rail Capacity: We will have five new process tracks, each approximately 1,260 feet in length, for a tpta; of 6,300 feet of process track. The project will boost annual freight rail capacity by 116%, increasing it from 44,000 to nearly 100,000 TEUs. The addition of new rail tracks will also provide increased storage for rail cars within the port.
  • Reduced Truck Traffic: By expanding intermodal rail capacity, the project will eliminate 29,000 truck trips annually from the congested Interstate 95 corridor and surface transportation network.
  • Job Creation: At least 105 direct jobs will be created during the construction phase, providing a boost to the local economy

The design build project is a collaboration between the Port, Gonzalez & Sons Equipment Inc., HDR, PSA Management, Transystems and Moffatt and Nichol. 

The project is divided into four phases. 

Phase 1: rail tracks west of Slip 2, a parking lot west of the molasses tanks and the refrigerated container area just east of the Port's main entrance.

Phase 2: Open Southgate to traffic, construct south track area and the south portion of Port Road (Scheduled to commence January 15th)

Phase 3: Open Main Gate to traffic, close old interchange, and construct the north portion of Port Road and Avenue E

Phase 4: Complete remaining items

Phased Project Approach image
PIDP construction work
  1. 1 Railroad Maintenance 1 March
  2. 2 Railroad Maintenance 2 March
  3. 3 Railroad Maintenance 3 March
  4. 4 Building 1 March
  5. 5 Railroad Maintenance 1 Feb.
  6. 6 Railroad Maintenance 2 Feb.
  7. 7 Building Feb.
  8. 8 Street Feb.
  9. 9 Wall Feb.
  10. 10 Railroad 1-10
  11. 11 Railroad looking east 1-10
  12. 12 Railroad 1-10
  13. 13 Railroad 1-10
  14. 14 Railyard 12-05
  15. 15 Railyard under bridge
  16. 16 Railyard looking east
  17. 17 Railyard near molasses tanks
  18. 18 Rail tracks 10-31-24
  19. 19 Rail tracks 10-31
  20. 20 Construction equipment 10-31
  21. 21 Aerial looking east 10-31
  22. 22 Laying down new track 10-31
  23. 23 Aerial looking west
  24. 24 PIDP 9-13-24